N2 - The present research was carried out in Peru, comparing the budget of the multifamily project of a construction company with BIM and traditional methodology, for the realization of the article a non-experimental, descriptive design was used, considering as population and sample a multifamily project of Constructora Galilea with traditional and BIM methodology, data collection was carried out through the documentary review technique, the instrument used was the matrix of categories, to analyze the data used descriptive statistics, the problem arises from the budget of the multifamily project of Constructora Galilea which was prepared using traditional methodologies to be compared with the same budget but prepared using the BIM methodology in order to exploit its benefits such as the optimization of resources and costs, the budget prepared using the traditional methodology resulted in a total of S/. 1,238,541.36 while the budget elaborated using the BIM methodology was S/. 1,096,844.25, it was possible to compare the budget of the multifamily project of the Galilea construction company with BIM and traditional methodologies resulting in an optimization of 11.44% in costs in favor of the BIM methodology.
AB - The present research was carried out in Peru, comparing the budget of the multifamily project of a construction company with BIM and traditional methodology, for the realization of the article a non-experimental, descriptive design was used, considering as population and sample a multifamily project of Constructora Galilea with traditional and BIM methodology, data collection was carried out through the documentary review technique, the instrument used was the matrix of categories, to analyze the data used descriptive statistics, the problem arises from the budget of the multifamily project of Constructora Galilea which was prepared using traditional methodologies to be compared with the same budget but prepared using the BIM methodology in order to exploit its benefits such as the optimization of resources and costs, the budget prepared using the traditional methodology resulted in a total of S/. 1,238,541.36 while the budget elaborated using the BIM methodology was S/. 1,096,844.25, it was possible to compare the budget of the multifamily project of the Galilea construction company with BIM and traditional methodologies resulting in an optimization of 11.44% in costs in favor of the BIM methodology.
KW - Budget
KW - Building Information Modeling
KW - multifamily
KW - traditional methodology
UR - https://www.scopus.com/pages/publications/85172328764
M3 - Contribución a la conferencia
AN - SCOPUS:85172328764
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 21st LACCEI International Multi-Conference for Engineering, Education and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Matta, Rodolfo Andres Rivas
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023
Y2 - 19 July 2023 through 21 July 2023
ER -